Publicerad: 2024-10-09
Electrical Lead, Gavle
Location: Gävle
Key Requirements:
- 3rd Level Building Services/Electrical Engineering Degree and/or Trade background
- Minimum 5 years plus experience in a site-based MEP role
- Experience working on hyperscale Data Centres
- Excellent IT skills
- Strong ability to collaborate and work as part of a high-performance team.
Key Responsibilities:
Reporting to the MEP Construction Manager in Region, your key responsibilities for the role will include but will not be limited to the following:
- To align Electrical activities so they are completed in a safe manner ensuring the Health and Safety of all stakeholders is kept to the forefront of any decisions made or works executed
- To lead by, example, and ensure all stakeholders are made aware of Company specific Health & Safety policies and procedures and ensure that Health & Safety forms a key part of any discussions
- To be fully aware of and ensure that all stakeholders are aware of the existence of any hazardous energies and any site-specific management strategies (Lock Out Tag Out) around these sources of energy
- To have a full working knowledge of the project electrical systems and equipment and to track systems installation to ensure it is compliant with specification and program needs
- To understand project specific commissioning requirements and to assist in the development of project specific Commissioning Implementation Plans (CIPs)
- To complete site quality inspections of the Electrical & CSA works to ensure the installation conforms to relevant requirements
- To coordinate that rooms and or areas meet the relevant CSA and MEP Quality standards and requirements for advanced Beneficial Use in line with the master construction program
- To ensure stakeholders receive sufficient information needed to progress systems installation suchthat it allows for works progression in line with the master construction program
- To ensure that contractors and vendors are adequately resourced to complete works successfullyin order to streamline and prioritize the execution of electrical activities
- To review the master construction schedule and identify opportunity and sequencing to focus on work faces in terms of electrical and CSA scope which will ultimately enhance program delivery
- To review the site construction power system (Temporary Power) to ensure it is installed to meet ongoing construction and commissioning requirements
- To chair and input into onsite and offsite meetings with all relevant project stakeholders as per project requirements
- Issue weekly progress and costs report
- Management of sub-contractor activities including tracking progress against schedule and manpower levels
- To review and ensure system electrical stakeholders both (internal and external) produce the following items:
- (i) Construction and Commissioning Programs reflective of the Master Construction Schedule
- (ii) Works execution documents and trackers
- (iii) Equipment Bills of Materials (BOMs)
- (iv) Risk Assessments and Method Statements
- (v) Progress reports reflective of their scope in alignment with their program
- (vi) All relevant Field and Vendor turnover/handover packs as required by the project.
Ansök via e-post till jobs@collen.com